The short answer

Volume = length × width × thickness. Put all three in one unit, then add an allowance for waste. A 20 by 10 ft slab, 4 in thick, with 10% extra is about 2.08 m³, or 2.72 cubic yards.

That is about 149 bags at 14 L a bag. For a slab this size, ask your supplier what they advise. The calculator shows an estimated cost once you enter your supplier's price.

Work out your concrete

No account needed

An estimate. Runs in your browser. Nothing you type is sent anywhere.

Units

The buttons change every measure. To mix units, pick a unit beside any one measure.

Long side

Short side

How deep the pour is

Slabs, pads or tubes the same size

A 30 kg bag yields about 14 L. Check your bag.

An example value. Change it to suit the job.

From your supplier's quote, before tax. Optional.

Concrete needed
2.08 m³
In cubic yards
2.72 cu yd
In cubic feet
73.33 cu ft
Or in bags
149
Estimated cost, from your unit price, before tax
—

Enter your supplier's price to see an estimated cost.

Confirm quantities with your supplier before you order.

Have your quantity? Turn it into a quote.

Biller emails a quote link with a valid-until date. The client accepts or declines on the page, and an accepted quote goes on your schedule as a job, ready to bill when the work is done.

Start free

Free plan with unlimited invoices. No credit card.

How the calculator works

  1. Every size becomes metres, so you can enter the length in feet and the thickness in inches.
  2. Volume = length × width × thickness. For a circle, volume = π × (diameter ÷ 2)² × depth.
  3. The volume is multiplied by how many you pour, then the waste allowance is added.
  4. Bags = volume ÷ the yield of one bag, rounded up to a whole bag.
  5. Estimated cost = your unit price × the quantity in that unit.

The assumptions

AssumptionDefaultWhere it comes from
Yield of a 30 kg bag14 L, which you can changeBoth the Quikrete Fast-Setting Concrete Mix data sheet and the Bomix concrete mix data sheet list about 14 L
Waste allowance10%, which you can changeAn example value, not a rule
Unit priceBlankYou enter it. We show no prices, because they change by supplier and region

Other products yield different amounts, so read your bag. The example dates and products are from sheets checked on October 31, 2026.

Worked example: a 20 by 10 ft slab

  1. Thickness: 4 in ÷ 12 = 0.333 ft.
  2. Volume: 20 × 10 × 0.333 = 66.67 cu ft.
  3. With 10% extra: 66.67 × 1.10 = 73.33 cu ft, which is 2.08 m³ or 2.72 cu yd.
  4. Bags: 2,077 L ÷ 14 L = 148.3, so 149 bags.

Before you pour

This page gives an estimate only. Confirm quantities with your supplier before you order.

This tool does not design anything. For slab thickness, reinforcement, footings and frost depth, follow your local building rules. For what to charge, see the markup calculator. To put the price in writing, use the bid template.

Questions

How do I work out concrete for a slab?

Multiply length by width by thickness, with all three in the same unit. A 20 by 10 ft slab, 4 in thick, is 20 × 10 × 0.333 = 66.7 cubic feet, or about 1.89 m³, before any allowance for waste.

How many bags of concrete do I need?

Divide the volume by the yield of one bag. Quikrete and Bomix each list about 14 L for a 30 kg bag, so one cubic metre is about 72 bags. Check the bag you buy, because yield changes by product.

Should I order in cubic metres or cubic yards?

Order in the unit your supplier quotes. The calculator shows both, so you can read the result either way.

How much extra concrete should I allow?

The calculator starts at 10% as an example value. Your own allowance depends on the job, the forms and the ground, so change it to suit.

Does this tell me how thick my slab should be?

No. It works out a quantity from the size you enter. For the thickness, reinforcement or mix a job needs, follow your local building rules and your supplier.

A good estimate only counts if the client says yes.

Biller takes you from quote to schedule to invoice, with e-Transfer and card payments and reminders for late payers. Free to start, Pro is $99 a year.

Start free — no credit card

Free plan · Pro $99/year · Built for Canada — e-Transfer and card payments

Not ready? Try the free bid template

About this information

This page is general information, not financial, legal, or tax advice. We gathered it from public sources (banks, payment providers, government agencies such as the CRA, and published industry rates), and it reflects our understanding when it was last updated. Rates, limits, fees, and rules change without notice, and your situation may differ from the general case.

Before you rely on anything here, do your own due diligence: confirm the details with the original source, and check that they are still current. For advice about your own finances, taxes, or legal position, hire a qualified professional such as an accountant, lawyer, or financial advisor. See our Terms for the full disclaimer. Last updated October 31, 2026.